Review these nine items together before releasing a two-color mold. Each decision should use the actual grades, part drawings, machine configuration and intended production sequence.
- Material pairing. Identify the grade and color package for each shot. Define whether the interface relies on adhesion, mechanical retention or both.
- Shrinkage. Check each grade and the restraint created by the first shot. Confirm critical dimensions after the specified conditioning.
- First-shot support. Locate and support the substrate during transfer and second-shot filling.
- Shutoffs. Review tolerance stack-up, contact and deformation at the boundary. Set dimensions for the actual tool and substrate.
- Gates and runners. Check filling, venting, gate vestige and how the second shot interacts with the first gate.
- Transfer or indexing. Check locating features and clearance throughout movement on the selected machine.
- Thermal circuits. Confirm separate zone needs, connection positions, hose travel and actual mold temperatures.
- Appearance. Specify the color boundary, surface finish and optical requirements. Trial transparent and opaque combinations with the intended grades.
- Acceptance. Agree on dimensional, appearance and interface tests. Record process conditions, accepted output and defects by cavity.
Use the machine configuration guide to connect these tooling checks to the equipment quotation.