What to Record at Vertical Molding Clamp Handover

How to prevent water ingress in vertical injection molding machines

Use a handover record to give production the approved configuration after a vertical molding machine and tool have been commissioned. Record the setup approved by qualified personnel and identify who can authorize later changes.

Identify the Released Setup

  • Machine and controller identification, mold revision and installed handling equipment.
  • Recipe reference, approved operating mode and applicable tool and travel limits.
  • Location of the setup sheet, commissioning report and manufacturer’s instructions.

Attach Acceptance Evidence

Record who verified the installed protective functions and where the verification results are kept. Attach first-piece dimensions and appearance checks. Assign owners and due dates to any unresolved commissioning issues before release decisions.

Assign Production Responsibilities

Confirm who loads and removes parts, handles alarms, approves a restart and performs changeovers. Route changes to tooling, controls or protection through the site’s review process and retain the revised approval record.

See the clamp commissioning review for the preceding stage.